Skip to content

[dr-autosync] scheduler resume after switching pd leader for 5min #6988

@mayjiang0203

Description

@mayjiang0203

Bug Report

What did you do?

After change pd leader, check scheduler status.

What did you expect to see?

Be better if take less than 2min.

What did you see instead?

After fix merge in 6.5.4, still hit same issue with #6920, but the fix for #6920 did reduce the probability of occurrence of this problem.

What version of PD are you using (pd-server -V)?

v6.5.4

Metadata

Metadata

Assignees

Labels

affects-6.5This bug affects the 6.5.x(LTS) versions.affects-7.1This bug affects the 7.1.x(LTS) versions.severity/majortype/bugThe issue is confirmed as a bug.

Type

No type

Projects

Status

Closed

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions