Skip to content

It takes extremely long (10-20 minutes) to change the view period on the chart. #746

@microdeth

Description

@microdeth

Hi, on the historical chart containing the temperature and humidity data when I switch from the last 8 hours to last 3 days, for example, it takes 10-20 minutes. Overall object scheme contains less than 10 data points, only device is connected is our self-designed PLC which have OPC UA onboard.
Thanks,
Dima.

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions