-
Notifications
You must be signed in to change notification settings - Fork 3
Open
Labels
T1dTime Estimate 1 DayTime Estimate 1 DayelixirPull requests that update Elixir codePull requests that update Elixir codeenhancementNew feature or enhancement of existing functionalityNew feature or enhancement of existing functionalityepicA feature idea that is large enough to require a sprint (5 days) or more and has smaller sub-issues.A feature idea that is large enough to require a sprint (5 days) or more and has smaller sub-issues.priority-2Second highest priority, should be worked on as soon as the Priority-1 issues are finishedSecond highest priority, should be worked on as soon as the Priority-1 issues are finishedtechnicalA technical issue that requires understanding of the code, infrastructure or dependenciesA technical issue that requires understanding of the code, infrastructure or dependencies
Description
This is what we need to get done:
- Add
GIF
of working App toREADME.md
add screenshot of demo to readme #4 - Document which permissions are required for running the App Chore: Inform of Required Token Permissions #206
- Get all
repos
for anOrganisation
Task: Get Repos for Org |> DB #220 - Get people who have starred a repo Task: Get
people
who have starred a repo #223 - Create a Schedule to get list of
users
while avoiding the5k/h
API limits Chore: How to effectively issue API requests when limited to5k/h
? #226 - Get
org
followers Task: Get Org Followers #227 - Get
orgs
foruser
Task: Get Orgs For User #232 - Deploy to
Hetzner
viaKamal
Task: Deploy toHetzner
🚀 #231 - Only show faces of
people
on the "Face Wall" Only Show Faces (Avatars That Look Like People) #230 - Dashboard Feat: Dashboard #233
Metadata
Metadata
Assignees
Labels
T1dTime Estimate 1 DayTime Estimate 1 DayelixirPull requests that update Elixir codePull requests that update Elixir codeenhancementNew feature or enhancement of existing functionalityNew feature or enhancement of existing functionalityepicA feature idea that is large enough to require a sprint (5 days) or more and has smaller sub-issues.A feature idea that is large enough to require a sprint (5 days) or more and has smaller sub-issues.priority-2Second highest priority, should be worked on as soon as the Priority-1 issues are finishedSecond highest priority, should be worked on as soon as the Priority-1 issues are finishedtechnicalA technical issue that requires understanding of the code, infrastructure or dependenciesA technical issue that requires understanding of the code, infrastructure or dependencies
Type
Projects
Status
More ToDo ThanCanEver Be Done