-
Notifications
You must be signed in to change notification settings - Fork 38
Description
Describe the Enhancement
dtcenter/MET#1870 adds 3 new configurable options for TC-Pairs. This task is to enhance the METplus TC-Pairs wrapper to make those options configurable:
valid_inc = [];
valid_exc = [];
write_valid = [];
All 3 are arrays of strings that are empty be default. The can be filled with a comma-separated list of double-quoted string in "YYYYMMDD[_HH[MMSS]]" format. They configuration of them is exactly the same as the existing init_inc and init_exc options.
Time Estimate
Estimate the amount of work required here.
Issues should represent approximately 1 to 3 days of work.
Sub-Issues
Consider breaking the enhancement down into sub-issues.
No sub-issues needed.
Relevant Deadlines
List relevant project deadlines here or state NONE.
Funding Source
2792541 (copied from dtcenter/MET#1870)
Define the Metadata
Assignee
- Select engineer(s) or no engineer required: George
- Select scientist(s) or no scientist required: Molly Smith
Labels
- Select component(s)
- Select priority
- Select requestor(s)
Projects and Milestone
Assigned to the beta2 cycle, but this can be moved to beta3 if needed.
- Select Repository and/or Organization level Project(s) or add alert: NEED PROJECT ASSIGNMENT label
- Select Milestone as the next official version or Future Versions
Define Related Issue(s)
Consider the impact to the other METplus components.
Enhancement Checklist
See the METplus Workflow for details.
- Complete the issue definition above, including the Time Estimate and Funding Source.
- Fork this repository or create a branch of develop.
Branch name:feature_<Issue Number>_<Description>
- Complete the development and test your changes.
- Add/update log messages for easier debugging.
- Add/update unit tests.
- Add/update documentation.
- Push local changes to GitHub.
- Submit a pull request to merge into develop.
Pull request:feature <Issue Number> <Description>
- Define the pull request metadata, as permissions allow.
Select: Reviewer(s) and Linked issues
Select: Repository level development cycle Project for the next official release
Select: Milestone as the next official version - Iterate until the reviewer(s) accept and merge your changes.
- Delete your fork or branch.
- Close this issue.