Feature #2354 v11.0.0-beta5 #2355
Merged
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Note that these are changes to the release notes and also updates to the unit test diff logic to handle the newly modified TCMPR lines and newly added TCDIAG lines.
Expected Differences
Do these changes introduce new tools, command line arguments, or configuration file options? [No]
If yes, please describe:
Do these changes modify the structure of existing or add new output data types (e.g. statistic line types or NetCDF variables)? [No]
If yes, please describe:
Pull Request Testing
After a flurry of PR's in recent days, I need to carefully check all the diffs vs develop-ref and then update develop-ref to get past them.
Recommend testing for the reviewer(s) to perform, including the location of input datasets, and any additional instructions:
None. I will review the MET-11.0.0-beta5 release notes myself:
https://met--2355.org.readthedocs.build/en/2355/Users_Guide/release-notes.html#met-version-11-0-0-beta5-release-notes-20221120
Do these changes include sufficient documentation updates, ensuring that no errors or warnings exist in the build of the documentation? [Yes]
Just the release notes.
Do these changes include sufficient testing updates? [No]
None needed.
Will this PR result in changes to the test suite? [No]
If yes, describe the new output and/or changes to the existing output:
Please complete this pull request review by [10/30/2022].
Pull Request Checklist
See the METplus Workflow for details.
Select: Reviewer(s)
Select: Organization level software support Project or Repository level development cycle Project
Select: Milestone as the version that will include these changes