This repository was archived by the owner on May 3, 2024. It is now read-only.
9-nodes cluster in VMware on Windows PC #285
Unanswered
andriytk
asked this question in
Show and tell
Replies: 1 comment 2 replies
-
Fantastic, @andriytk . |
Beta Was this translation helpful? Give feedback.
2 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
Managed to start 9-nodes cluster (7 server nodes with the disks + 1 cmu + 1 client node) in VMware+Vagrant environment on my Windows PC desktop with 8+2 EC-configuration and run a smoke performance test:
Memory footprint and CPU load during the test:
Note: in case Motr is installed not from rpm, but compiled manually - make sure to configure it with
--disable-expensive-checks
to get some reasonable perf numbers.Versions:
Cluster configuration file (CDF): cmu-ssu7-cleint1-cdf.yaml.txt.
Beta Was this translation helpful? Give feedback.
All reactions