You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I hope this doesn't come across as unqualified, but I wanted to share my observations and would like to get your feedback.
Today, Renovate gave us a PR for the version upgrade from 8.8.74 to 8.8.165. When running our PR pipeline, I noticed that the test duration has increased significantly.
Normal run duration of the unit-test step was around 4~6 minutes:
After upgrading to the latest version, this step increased to over 13 minutes:
I re-ran the whole pipeline to ensure it wasn't an issue caused by machine load or something similar - the result was nearly the same:
I'm not sure what additional information I can provide, but I would appreciate any feedback and am happy to provide it.