Skip to content

Conversation

atimin
Copy link
Member

@atimin atimin commented Sep 5, 2025

Closes #

Please check if the PR fulfills these requirements

  • Tests for the changes have been added (for bug fixes / features)
  • Docs have been added / updated (for bug fixes / features)
  • CHANGELOG.md has been updated (for bug fixes / features / docs)

What kind of change does this PR introduce?

Update

What was changed?

Update the extensions to the version that was built using Rust 1.89

Related issues

https://github.com/reductstore/select-ext/pull/31

https://github.com/reductstore/ros-ext/pull/42

Does this PR introduce a breaking change?

No

Other information:

@atimin atimin merged commit f392b66 into main Sep 5, 2025
3 checks passed
@atimin atimin deleted the update-ext branch September 5, 2025 06:20
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

1 participant